PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st floor Block work at 1st floor Locker Rooms Facing North.jpg Block work at Bathrooms 133-136 Facing North.jpg Block work at Intake Room Facing West.jpg Connecting copper piping at the 2nd floor VAV boxes Facing West.jpg Split wire above the ceiling at the 3rd floor Facing East.jpg Started laying out block at Stair -3 Facing North.jpg
Previous pageNext page Block work at Bathrooms 133-136 Facing North
Block work at Bathrooms 133-136 Facing North